Le marché détermine la devise, le catalogue et les paiements, sans changer la langue.
English
"November 2013"--cover · "BLM/CA/PL-2014-001+1793"--page 2 · The PA and EIS/EIR analyzes the impacts of Desert Stateline, LLC's (Applicant's) proposed Stateline Solar Farm Project. The Applicant, a wholly owned subsidiary of First Solar Development, Inc., has filed Application CACA #48669 for a Right-of-Way (ROW) authorization with the BLM to construct, operate, maintain, and decommission an approximately 2,143 acre (ac), 300-megawatt (MW) alternating current (AC) solar photovoltaic (PV) energy generation facility
Connectez-vous à votre compte gratuit pour lire, télécharger des EPUB ou écouter.
Solar power plants · Solar power plants · Photovoltaic power systems · Electric power transmission · Public lands · Solar power plants · Ecology