English
Two heats of HF-1 steel which were purchased and metallurgically characterized in the previous phase of this project were used to determine the efforts of vendor and/or cooling method (used to produce the steel) on the production of the M549 projectile warhead metal parts. Parameters investigated included mult-parting, forging, rough-machining and nosing. The study included the design and development of tooling and forging and machining parameters in attempt at a cost-effective manufacturing process.
Accedi al tuo account gratuito per leggere, scaricare EPUB o ascoltare.
DTIC Archive · Kane, J F · SCRANTON ARMY AMMUNITION PLANT PA · *ORDNANCE STEEL · *PROCESSING · *PRODUCTION · *STEEL · ARTILLERY · BILLETS(MATERIALS) · CLEANING