English
SoCalGas Line 1167 Relocation at Ballona: Engineering Scope, Operational Impacts, and Permitting Pathway (Rev. v2.18) Rev. v2.18 (October 7, 2026) supersedes Rev. v2.10. It adds public records located since v2.10, again reviewed under the TARC method and adjudicated by the author. New material includes the September 2017 Draft EIS/EIR, which preferred excavating and removing a 1,500-foot portion of the existing crossing over abandoning it in place; the Army Corps' 2019 letter treating CDFW's restoration permit application as withdrawn; the October 2023 Notice of Preparation, which limits the revised EIR to the issues identified by the court and does not mention Line 1167; the status of the revised EIR through early October 2026; and the CPUC's July 2024 closure of its Playa del Rey inspection. The report's main conclusions are unchanged: about 2,500 feet of new pipe and 30 days of field work, an isolated section of the line during tie-ins, no public record of the existing pipe's depth, and permitting, not construction, as the controlling step. An independent research report on the proposed relocation of Southern California Gas Company (SoCalGas) Transmission Line 1167, a 30-inch hi
Sign in with your free account to read, download EPUBs or listen.
Ebook · SoCalGas Line 1167 Relocation at Ballona: Engineering Scope, Operational Impacts, and Permitting Pathway (Rev. v2.18) · Tom McMahon · Internet Archive
Ballona Wetlands Restoration Project · Ballona Wetlands · Area B · CDFW · California Department of Fish and Wildlife · Friends of Ballona Wetlands · Tom McMahon · SoCalGas · Southern California Gas Company · USACE