English
3 volumes (various pagings) : 30 cm · Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, from the Delaney Substation near Tonopah, Arizona, to the Colorado River Substation near Blythe, California...The Proposed Action is 114.3 miles long and generally follows the existing Devers to Palo Verde transmission line, including a 24.9-mile long crossing of the Kofa National Wildlife Refuge (NWR). The Agency Preferred Alternative is 125.0 miles long, utilizes BLM utility corridors, and does not cross the Kofa NWR · Includes bibliographical references (Appendix 6) and index · Vol. 1. Text -- Vol. 2. Appendices 1-2B -- Vol. 3. Appendices 2C-8 · "September 2019." · "BLM estimated total cost of developing and producing this document: 5,014,050 USD." · "Cooperating agencies: Bureau of Reclamation ; California Public Utilities Commission ; Environmental Protection Agency ; Department of Defense ; Yuma Proving Ground ; U.S. Fis
Sign in with your free account to read, download EPUBs or listen.
Electric lines -- Environmental aspects -- Arizona · Electric lines -- Environmental aspects -- California · Electric power transmission -- Environmental aspects -- Arizona · Electric power transmission -- Environmental aspects -- California · Land use -- Arizona -- Planning · Land use -- California -- Planning · Environmental impact statements · Electric lines -- Environmental aspects · Electric power transmission -- Environmental aspects · Environmental impact statements